● LOCATION: around Aewol
Port in Jeju city, Jeju Special Self-governing province,
Korea
● YEAR: 2010 - 2011
● CLIENT: Jeju
Special Self-Governing Province, Korea
○ Basic investigation
- Research on environmental conditions, location conditions, and port
state and construction conditions
○ Field survey
- Topographical survey
- Bathymetric survey & Surface investigation
- Maritime survey - Geotechnical investigation
(marine work)
- Survey on land, indemnification, and
worksite for the construction
○ Review on the preceding master
planning
○ Basic & Detailed design
- Waterfront facilities (sea route, turning basin, and others)
- Counter facilities: North breakwater (250 m), East breakwater
(100 m), Retaining revetment (1,125 m)
- Berthing facilities (1,000 DWT x 2 berths, 3,000 DWT x 1 berth)
- Connecting revetment: 60 m
- Dredging and reclamation
- Removal of the previous breakwater
○ Experiments and review on diverse
impact from the development
- Numerical model test
- Maritime traffic safety inspection
- Surface survey for cultural properties
- Sea area utilization consultation
- Review of pre-construction disaster impact
-
Analyze traffic impact and set improvement measure
